Arrow Lake-H processors

5 processors codenamed Arrow Lake-H. Sockets used: BGA 2049 (5).

About Arrow Lake-H

Lion Cove and Skymont mobile processors with Arc graphics and an AI Boost NPU, launched in January 2025 at 28 W with a 45 W flagship. Socket: BGA 2049, 2025.

Processors

ProcessorSocketCores / threadsBase / boostTDPLaunched
Intel Core Ultra 5 225HBGA 204914 / 141.7 / 4.9 GHz28 WJan 2025
Intel Core Ultra 5 235HBGA 204914 / 142.4 / 5.0 GHz28 WJan 2025
Intel Core Ultra 7 255HBGA 204916 / 162.0 / 5.1 GHz28 WJan 2025
Intel Core Ultra 7 265HBGA 204916 / 162.2 / 5.3 GHz28 WJan 2025
Intel Core Ultra 9 285HBGA 204916 / 162.9 / 5.4 GHz45 WJan 2025